Most HVAC companies deliver products and leave. Enerama designs, engineers, builds, and commissions your complete climate environment — then stays engaged until your team is fully confident.
Start Your ProjectEngineering · Procurement · Construction — one team, one contract, one point of accountability
We analyze your facility, define the precise climate requirements, and design a custom Dragon Liquid Desiccant system tailored to your specific environment, capacity, and energy targets.
We source, specify, and produce every component — from the Dragon platform hardware to auxiliary systems. No third-party coordination burden for you.
Our engineering team installs, integrates, tests, and commissions the complete system on-site. We don't leave until it works exactly as designed.
A transparent process — from first call to fully operational system
We start by understanding your facility, your environment, and your goals. No pressure, no sales pitch — just an engineering conversation about what you need.
Our engineers assess your site conditions — dimensions, climate zone, existing systems, energy consumption — and determine the optimal Dragon configuration for your application.
We engineer a complete solution: airflow modeling, Liquid Desiccant concentration parameters, regeneration heat source selection, water recovery integration, and control logic.
We produce and prepare all system components. Dragon platform units are configured and tested at our facility before shipment to your site.
Our team installs and integrates the complete system. We run full performance tests, validate all parameters, and ensure the system meets every specification before handover.
After commissioning, we stay engaged for 60 days via online monitoring and support. We train your team, track system performance, and resolve any fine-tuning needed for optimal operation.
Most climate control projects involve multiple vendors — a manufacturer, a local installer, a controls company, a commissioning specialist. When something goes wrong, each points to the other. You're left managing conflicts between parties who share no accountability.
Enerama eliminates this. One contract. One team. One point of contact from day one to full operation.
From signed contract to fully operational system
Note: Timeline varies by project scope and site conditions. Complex multi-unit installations may require additional time. Contact us for a project-specific estimate.
Across agriculture, food processing, industrial, and controlled environment applications.
Tell us about your facility and requirements. Our engineering team will respond within 48 hours.