27 Commissioned Projects · Real Results

27 Projects. Proven in the Field.

Not simulations. Not prototypes. Real Dragon™ systems operating in real facilities — across agriculture, food processing, industrial, and controlled environment applications.

27
Completed Projects
3
Countries
14 Years
Operational History
0
Critical Failures

Real Facilities. Real Results.

See our Dragon systems operating in industrial environments across 3 continents.

Selected Project Highlights

Detailed results from representative Dragon™ installations

Industrial food storage facility with Dragon climate control
Food Storage

Industrial Food Storage

Location: Istanbul, Turkey

Scale: Large-scale dry goods warehouse

Challenge:

Large dry goods storage facility required precise humidity control to prevent product degradation while minimizing energy costs. Previous system caused inconsistent humidity leading to spoilage losses.

Dragon Solution:

Dragon Climate Control system with continuous humidity monitoring. Natural mold prevention. 24/7 stable environmental conditions.

Results:

  • 40–55% energy savings vs previous HVAC system
  • Stable humidity maintained year-round
  • Water recovered from air — operational cost offset
  • Zero product spoilage incidents since commissioning
  • System operating — 14 Years continuous operation
Persimmon drying facility in Turkiye
Food Processing

Persimmon Drying Facility

Location: Adana, Turkey

Scale: 100-ton capacity · Industrial scale

Challenge:

Client required industrial-scale persimmon drying with precise humidity control to achieve consistent product quality. Conventional drying systems consumed excessive energy and produced inconsistent results.

Dragon Solution:

Custom Dragon Liquid desiccant dehumidification system with independent dew point control. Continuous 24/7 operation cycle. Natural mold prevention through Liquid desiccant pathogen elimination.

Results:

  • Consistent dew point maintained throughout drying cycle
  • 24/7 uninterrupted operation achieved
  • Natural mold elimination — zero chemical additives
  • Significant energy reduction vs prior system
  • Water recovered from drying process reused on-site
Environmental control system for commercial operations
Industrial

Environmental Control System

Location: Zürich, Switzerland

Scale: Sensitive production environment

Challenge:

Precision manufacturing environment requiring stable humidity and temperature for process quality. High regulatory standards. Refrigerant regulations restricting conventional HVAC.

Dragon Solution:

Custom Dragon Liquid desiccant system with Mekasera SCADA remote monitoring. Refrigerant-free operation. Independent temperature and humidity control.

Results:

  • Precise humidity maintained within ±2% RH
  • Zero refrigerants — EU regulatory compliant
  • Remote monitoring via Mekasera SCADA
  • Energy consumption below target specification
  • Continuous operation since commissioning
Controlled environment agriculture facility
Agriculture

Controlled Environment Agriculture

Location: California, USA

Scale: Year-round indoor production facility

Challenge:

California energy costs among highest in USA. Water scarcity requiring maximum recovery. Pathogen control critical for food safety compliance.

Dragon Solution:

Dragon Climate Control with water recovery integration. Natural pathogen elimination replacing chemical treatment. Energy optimization for California grid conditions.

Results:

  • Year-round production independent of outdoor climate
  • Water recovery reducing municipal water consumption
  • Natural pathogen control — FDA food safety compliant
  • Energy cost reduction vs conventional HVAC
  • System fully operational since commissioning
Food Storage

Industrial Food Storage

Location: Istanbul, Turkey

Scale: Large-scale dry goods warehouse

Challenge:

Large dry goods storage facility required precise humidity control to prevent product degradation while minimizing energy costs. Previous system caused inconsistent humidity leading to spoilage losses.

Dragon Solution:

Dragon Climate Control system with continuous humidity monitoring. Natural mold prevention. 24/7 stable environmental conditions.

Results:

  • 40–55% energy savings vs previous HVAC system
  • Stable humidity maintained year-round
  • Water recovered from air — operational cost offset
  • Zero product spoilage incidents since commissioning
  • System operating — 14 Years continuous operation
Multi-Site

Portfolio — 27 Project Summary

Location: USA · Switzerland · Turkey

Scale: Full operational portfolio

Challenge:

Diverse client base requiring custom climate solutions across multiple countries, climates, and application types. Consistent performance demanded across all sites.

Dragon Solution:

Standardized Dragon Liquid desiccant platform with application-specific customization for each site. Mekasera SCADA for portfolio-wide monitoring. Full EPC delivery model ensuring accountability.

Results:

  • 27 projects commissioned — all operational
  • Zero critical failures across entire portfolio
  • 350+ Dragon conditioning units installed
  • 2,830 kW total installed capacity
  • 14 Years operational history validated

Inside a Dragon Installation

US facility mechanical room — Dragon system in operation

Client Confidentiality

Enerama respects the confidentiality of our clients. Detailed case study data, specific client names, and facility information are available to qualified investors and partners under Non-Disclosure Agreement.

Contact us to arrange a detailed project briefing.

Request NDA Briefing

Ready to Be Our Next Success Story?

Join 27 facilities across 3 countries that chose Enerama for their climate control.